IMP POINTS FOR PRESENTATION.....


Important Points from Presentation
A design engineer’s responsibility should include assuring the structural safety of the design, details, checking shop drawing.

Detailing is as important as design since proper detailing of engineering designs is an essential link in the planning and engineering process as some of the most devasting collapses in history have been caused by defective connections or DETAILING. There are many examples explained in the book” DESIGN AND CONSTRUCTION FAILURES by Dov Kaminetzky.

Detailing is very important not only for the proper execution of the structures but for the safety of the structures.

Detailing is necessary not only for the steel structures but also for the RCC members as it is the translation of all the mathematical expression’s and equation’s results.

For the RCC members for most commonly used for buildings we can divide the detailing for Slabs-with or without openings.(Rectangular,circular,non-rectangular-pyramid slab,triangular etc) balcony slab, loft slab, corner slab etc

Beams – With or without openigs.(Shallow & deep beams)
Columns – (Rectangular,l-shape,t-shape, circular,octagonal,cross shape etc)
Foundations.

Detailing for gravity loads is different from the lateral loads specially for the SEISMIC FORCES.

Apart from the detailing for the above there is a different detailing required for the Rehabilitation and strengthening of damaged structures.

We will now dwell on the DETAILING OF MEMBERS FOR THE GRAVITY AND SOME CODAL DETAILINGS AS PER IS CODE IS 13920 AND IS 4326 AS REQUIRED FOR SEISMIC FORCES.

Sunday, July 31, 2011

CIVIL ENGG FACTS...IN INDIA

 # Sardar Sarovar Dam being executed by the group is the third largest in the world for volume of chilled concrete to be placed -nearly 7 million cum.

# Indira Sagar a 1000 MW Power house is the second largest surface power house in the country.

# Nathpa Jhakri a 1500 MW Power House is the largest underground power house in India.

# Tehri Dam is the third tallest rock fill dam in the world, and the largest in Asia involving placement of over 25 million cum of all types of fill material.

# Baglihar Hydroelectric project involved construction of 30km of project road along with three bridges.

# Brahmaputra Guide Bund completed in a record time of 7 months.

# Baspa-II and Chamera-II projects involved continuous concrete shuttering for tunnel lining which is used for the first time in the country.

# Teesta V project has been provided with Jet Grouting curtain is being provided below the coffer dams for the first time in India.

# Alimineti Madhva Reddy Irrigation project is the longest underground face to face tunnel in the world.